Set scheduled / gantt task fields on topics: start and due dates (epoch ms), duration (ms), progress (0..1) and priority (0..9). Merges with any existing task data. Each item carries its own schedule, so put every topic you are scheduling in one call (up to 200 items) — do NOT call this once per topic; a project plan is one call, not one per row. Each item must set at least one field. This is a paid feature — it requires the file's plan to allow gantt editing.

productivityOAuth1 credits

Call information

Tool slug
xmind.xmind_set_planned_task
Provider
Xmind
Average response
0 ms
Calls in 7 days
0

Input parameters

fileIdrequired

The ID of the mindmap file.

itemsrequired

One entry per topic to schedule — batch them into a single call (up to 200).